포토뉴스 PRESIDENT INAUGURATED THREE GEOTHERMAL POWER PLANT PROJECTS
페이지 정보
본문
Indonesian President Joko Widodo (left) accompanied by Coordinating Minister for Maritime Luhut Panjaitan (center), Minister of Energy and Mineral Resources Ignatius Jonan (right), Pertamina President Director Dwi Soetjipto (second right), and President Director of Pertamina Geothermal Energy Irfan Zainuddin (second left) reviewing geothermal electricity Units 5 & 6 PT Pertamina Geothermal Energy Lahendong during the inauguration in Tompaso, Minahasa, North Sulawesi, on Tuesday (27/12). President inaugurates infrastructure of Geothermal Power Plant (PLTP) projects Lahendong Units 5 & 6 Minahasa capacity of 2 x 20 MW, and Geothermal Power Plant Unit 3 Lampung Ulubelu 1x55 MW capacity which is expected to drive the economy of the people from the flow of electricity, the opening of employment, and the growth of new industries. (ANTARAPhoto/Puspa Perwitasari)
- 이전글IMMIGRATION ARRESTED FIVE FOREIGN CITIZENS ABUSING RESIDENCE PERMIT 16.12.30
- 다음글ONE FAMILY WAS KILLED IN EAST JAKARTA 16.12.28
댓글목록
등록된 댓글이 없습니다.